Premier Yarns Parfait Faux Shearing Slippers

Back to category
by Premier Yarns Design Team

Premier Yarns Parfait Faux Shearing Slippers

Cutest. Baby slippers. Ever.

Project Details

  • Level:intermediate
  • Time:3 hours

Project Instructions

  • 1
    Use a gauge of about 12 sts x 20 rows (about 4 inch) in St st to crochet slippers that measure about 3 (4-1/2) inch each. This translates approximately to Baby (Toddler). Save time, check your gauge. If the hook or needle listed under supplies does not work, use the size that allows you to obtain the required gauge. Pattern and supplies are written for smallest size with changes for larger sizes in parentheses. When only one number is given, it applies to all sizes. To follow a pattern more easily, circle all numbers pertaining to your size before beginning.
    Download the template for abbreviations not explained elsewhere.
  • 2
    Slippers (make 2):
    Sole:
    With Toffee, cast on 15 sts, leaving a long tail for seaming.
    Row 1 (WS): Knit.
    Row 2 (RS): Kfb, k4, [kfb] 4 x, k4, kfb, k1 – 21 sts.
    Row 3: Knit.
  • 3
    Toddler Size Only:
    Row 4: Kfb, k5, kfb, k1, kfb, k2, kfb, k1, kfb, k5, kfb, k1 – 27 sts
    Row 5: Knit.
  • 4
    Both Sizes – Turning Ridge:
    Row 4 (6): Purl.
    Row 5 (7): Knit.
  • 5
    Side:
    Row 1 (RS): Knit.
    Row 2 (WS): Purl.
    Rep last 2 rows, 1 (2) more times.
  • 6
    Shape Top:
    Row 1 (RS): K12 (15), ssk, turn.
    Row 2: Sl 1, p3, p2tog, turn.
    Row 3: Sl 1, k3, ssk, turn.
    Row 4: Sl 1, p3, p2tog, turn.
    Rep Rows 3-4 until 13 (15) sts rem on ndls.
    Next Row (RS): Knit to end of row – 13 (15) sts rem.
  • 7
    Leg:
    Row 1 (WS): Purl.
    Row 2: Knit.
    Row 3: Purl.
    Rep last 2 rows, once more.
    Cut Toffee, switch to White.
    With White, knit 4 rows.
    Bind off all sts loosely. Cut White leaving a long tail.
  • 8
    Finishing:
    With White and crochet hook, work a row of slip stitch crochet along Turning Ridge, then work slip stitch crochet along either side of the shaping along the top and down to the Turning Ridge, using photo as a guide.
    With cast-on end, sew seam on Sole.
    With bind-off tail, whip st back seam (stitching should be visible).
    Weave in ends.

Project Details

  • Level:intermediate
  • Time:3 hours

Project Supplies

  • Premier Yarns Parfait Toffee 104798066
  • Premier Yarns Parfait White 104797804
  • Clover Takumi Bamboo Premium Knitting Needles Single Point 13 inch No. 9/5.5 mm 104236577
  • Clover Amour Crochet Hook I 5.5 mm 104755763
  • Tapestry Needle
Download Project Template